park hills II Condo Association

 

One of the buildings at Park Hills II Condominium in Pewaukee, WI was experiencing basement flooding during rainfall events and subsequent building structural degradation. Stormwater Solutions Engineering, LLC (SSE) evaluated the site, and identified several drainage concerns. SSE worked closely with the Park Hills II board and property manager, and ultimately proposed additional storm sewer and yard inlets around the building to provide a pathway for runoff and roof drainage. An overflow swale was proposed around the existing undersized storm sewer to direct surface flows away from the building. SSE worked with several contractors to provide a construction estimate under the proposed budget! Storm sewer installation will begin in the Winter 2019, with grading and site restoration to occur in Spring 2019. SSE will provide construction oversight during the process.